Mobile service: we come to you · Mount Albert, the GTA & beyond Dripless, environmentally safe oil spraying (437) 999-1637 oes@ontarioequipmentservices.ca

Greasing guide

How Often Should Heavy Equipment Be Greased? A Pivot-Point Guide

The real answer to “how often?” is in your operation and maintenance manual, but published intervals follow a clear pattern. Here’s what manufacturers say, which pivot points wear first on each machine, and how washing, cold and salt change the routine.

Loader pivot pins, bushings and linkage that need regular greasing
The short answer

Follow the grease points and intervals in your machine’s operation and maintenance manual. As a pattern, the hardest-working pins are greased daily or every 8 to 10 hours: DEVELON says excavator boom, stick and bucket pins typically need daily greasing, and Bobcat lists the lift arms, links and coupler on its compact track loaders every 8 to 10 hours. Other points run longer intervals. Grease more often in mud, water or salt, and always after washing.

Your operation and maintenance manual is the authority

Every machine comes with an operation and maintenance manual, and its lubrication chart is the only answer to “how often?” that fits your exact equipment. It lists each grease point, the interval in service hours or calendar time, and the grease the manufacturer specifies. Machines that look alike can have different charts because of model year, serial range or attachments.

Manufacturers say this plainly. DEVELON’s heavy excavator product manager calls following the manufacturer’s plan the simplest and most effective maintenance tip, because the manufacturer knows the machine best, and suggests contacting your dealer for a replacement or electronic copy if the manual has gone missing (source: DEVELON). Genie notes that every one of its telehandler models comes with its own maintenance manual (source: Genie), and Bobcat says its own maintenance checklist isn’t meant to replace its official manuals (source: Bobcat).

Manual intervals are also written for typical work. JLG points out that its published telehandler intervals are for normal conditions and usage, and that daily use or configuration can call for additional checks (source: JLG). If your machine works in mud, water, dust or salt, treat the book interval as the minimum.

What published grease intervals usually look like

Read enough manuals and a pattern appears. The pins that carry the most load and move the most, usually at the working end of the machine, sit at the top of the schedule with a daily or every-shift interval. Points that move less, or sit protected inside the machine, are greased weekly, monthly or at longer service intervals. A few published examples:

  • Excavators: DEVELON says critical points like the boom, stick and bucket pins typically require daily greasing, with the manufacturer’s schedule covering everything else (source: DEVELON).
  • Compact track loaders: Bobcat’s maintenance checklist calls for the lift arms, lift links, cylinders, Bob-Tach coupler, pivot pins and wedges to be lubricated with multipurpose lithium-based grease every 8 to 10 hours (source: Bobcat).
  • Telehandlers: Genie schedules boom lubrication every 8 hours or daily and puts the driveshaft on its quarterly list (source: Genie). JLG’s telehandler schedule includes lubrication items at 50-hour and 250-hour intervals (source: JLG).
  • Fifth wheels: SAF-HOLLAND calls for lubricating the locking mechanism on its HOLLAND fifth wheels every 3 months or 30,000 miles (about 48,000 km), whichever comes first (source: SAF-HOLLAND).

Grease points by machine type

Here’s where the high-wear pivots are on common types of equipment, and where to find the interval for each. Published figures are shown with their source; otherwise, the answer lives in your manual. Attachments such as thumbs, augers, breakers and quick couplers often carry grease points of their own, so include them in the count.

MachineKey grease pointsWhere to find the interval / published example
Excavators and mini excavatorsBoom foot pin, boom, stick and bucket cylinder pins, boom-to-stick pin, bucket pins and linkage, quick coupler, swing bearing; blade and boom swing pivots on minisLubrication chart in the manual; DEVELON: boom, stick and bucket pins typically daily (DEVELON)
Wheel loadersLoader arm pivots, lift and tilt cylinder pins, bucket linkage, centre articulation hinge, steering cylinder pinsLubrication chart in the manual; working-end pins usually sit on the most frequent list
Skid steers and compact track loadersLift arm pivots, lift links, lift and tilt cylinders, coupler pivots and wedgesBobcat compact track loaders: every 8 to 10 hours (Bobcat); skid steers: your model’s manual
DozersBlade lift and tilt cylinder ends, push-arm or C-frame pivots, ripper linkageLubrication chart in the manual; double shifts in dusty work call for more frequent greasing (Construction Equipment)
TelehandlersBoom sections and wear pads, boom pivot, lift, tilt and extend cylinder pins, carriage and coupler, driveshaftGenie: boom every 8 hours or daily, driveshaft quarterly (Genie); JLG: lubrication items at 50 and 250 hours (JLG)
ForkliftsSteer axle kingpins and linkage, tilt cylinder pins, mast pivots and the carriage points shown on the chartLubrication chart and planned-maintenance schedule in the manual, or from your dealer
Trucks, trailers and fifth wheelsFifth wheel top plate and locking mechanism, chassis grease fittings, hitches, dump body hinges and hoist pivotsSAF-HOLLAND: locking mechanism every 3 months or 30,000 miles (SAF-HOLLAND); NoLube models differ; truck and trailer manuals for the rest

Trucks, trailers and the jobs that belong to a mechanic

On a tractor or straight truck, the chassis grease points, such as steering kingpins, driveline U-joints and slip yokes, and spring pins where the suspension has fittings, follow the truck maker’s maintenance schedule. Fifth wheels have their own: SAF-HOLLAND’s procedure is to remove the old grease and debris from all fifth wheel-to-trailer contact surfaces, then apply new water-resistant lithium-based grease, and it notes that standard greased fifth wheels and its NoLube versions have different lubrication needs (source: SAF-HOLLAND).

Trailer and truck wheel bearings are a different matter. Repacking or adjusting wheel bearings is wheel-end work tied to the brakes and hub, and it’s a job for a mechanic, not a grease gun on a walk-around. The same goes for brake adjusters and anything else that affects stopping. If we see a hub weeping grease while we’re on site, we’ll point it out so your mechanic can look.

Signs a pivot point is running short of grease

Joints that are short of grease warn you before they fail. DEVELON lists unusual noise from moving joints, excessive heat at connections and wear particles around the pins as signs an excavator is under-lubricated (source: DEVELON), and a trade guide notes that starved pivots and bearings can start to grind and make operation sluggish (source: Construction Equipment). On your walk-around, look and listen for:

  • Popping or chattering from a pin as the boom, arms or bucket move under load
  • A rim of rust-coloured or dark, gritty residue at the ends of a pin instead of a clean collar of fresh grease
  • A joint that feels warm after work when its neighbours don’t
  • Slack you can see: the bucket or attachment rocks before it starts to move
  • Fresh grease that never appears at the joint no matter how much you pump

Winter, water and salt: why to grease after washing

Ontario winters change the routine in three ways: water gets into joints, cold stiffens grease, and road salt makes any trapped moisture far more corrosive.

Washing is part of the story. Getting salt off a machine is essential, but water can be driven past seals into pins and bushings. The fix is the order: wash first, then grease, so fresh grease pushed through the joint carries the water and any salty residue out with the old grease. Our guide on how often to wash salt off construction equipment covers the washing side.

Cold is the second factor. Low temperatures make grease stiffer, to the point where it may not flow properly, which is why low-temperature greases exist (source: Construction Equipment). SAF-HOLLAND says the same of fifth wheels: in extreme cold, lubricants can become thick and binding, and road salt can corrode tractor and trailer components and, left unchecked, affect how a fifth wheel performs (source: SAF-HOLLAND). Use the grease your manual specifies, and ask your dealer whether a winter-grade product suits your machine.

The same trade guide names moisture, dust and extreme temperatures among the conditions that call for more frequent greasing (source: Construction Equipment). A few winter habits help:

  • Grease after every wash, not before it.
  • Keep fittings wiped or capped so slush and grit don’t go in with the next shot.
  • Check fifth wheels and hitches after salty highway runs, and clear packed snow and ice before coupling.

How much grease: purge the old, don’t pressurize the seals

Start with a clean fitting. JLG’s guidance is to clean the lubrication fittings before lubricating (source: JLG), because whatever sits on the nipple goes into the joint with the first stroke. A fitting that’s cracked, flattened or won’t hold the coupler should be replaced.

On most pins and bushings, the aim is to pump fresh grease in until the old, dark grease is pushed out and clean grease appears at the edges of the joint, then stop. That’s the visible sign that the joint is full and the contaminated grease, water and grit are gone. Some points, such as swing bearings, may have their own procedure or a set amount in the manual, so follow it instead of pumping until something gives.

More is not better. A trade guide warns that excessive grease can rupture seals and let contaminants in, that over-greased parts can run hot, and that grease oozing from seals is a warning sign (source: Construction Equipment). If a fitting refuses grease, stop and find out why rather than leaning on the gun: the same guide notes it can be a failed fitting, but is more often a blocked bushing (source: Construction Equipment).

Finish by moving the joint. JLG recommends cycling through the machine’s functions several times after greasing to help distribute the lubricant (source: JLG). Then wipe off the excess, which only collects grit.

Keeping a greasing schedule that actually happens

Missed grease points rarely come from not knowing the interval. They come from busy weeks, changing operators and machines spread across different sites. A trade guide treats a detailed lubrication schedule as just as important as any other preventive maintenance task, and recommends documenting each greasing (source: Construction Equipment). A simple split works for most yards:

  • Daily points stay with the operator as part of the start-of-shift walk-around.
  • Longer-interval points go on the hour meter or a calendar, with a log in the cab showing when they were last done.
  • Every grease job is written down: date, hours, points done and any fitting that wouldn’t take grease.
  • Machines coming off a wash, a wet job or a salted haul road get greased that day, whatever the log says.
  • Before winter, and after the spring wash-down, every fitting on every unit gets done in one pass.

How OES does greasing on site

OES greases equipment where it’s parked. We’re a mobile service with no shop, so there’s no float to book. From our base in Mount Albert we cover the GTA and beyond, and one visit can take care of a whole yard of machines, trucks and trailers.

The grease points and intervals come from your manufacturer’s manual, not from habit. We wipe each fitting, push fresh grease through until the old grease is purged, and pay particular attention to the hard-to-reach fittings that tend to get skipped. Any fitting that refuses grease, or a pin with visible play, gets flagged for your mechanic. Wheel bearings, brakes and pin and bushing replacement stay with your mechanic.

Greasing slots in with our other services. We can power wash first and grease straight after, so wash water doesn’t sit in the joints, then oil spray the steel around pins and linkages with our dripless amber oil, as our guide on how road salt eats heavy equipment explains. For fleets, we can schedule regular visits. Call (437) 999-1637 or email oes@ontarioequipmentservices.ca for a free, no-obligation quote.

Key takeaways

  • Your operation and maintenance manual sets the grease points, intervals and grease type for your exact machine.
  • The hardest-working pins are usually greased daily or every 8 to 10 hours; other points run longer intervals.
  • Grease more often than the book in mud, water, dust or salt, and always after washing.
  • Purge old grease until fresh grease shows, then stop; over-greasing can rupture seals.
  • Noise, heat, wear particles and fittings that won’t take grease are signs a joint is starving.
  • Trailer wheel bearings and brake parts are a mechanic’s job, not a walk-around greasing task.
FAQ

Frequently asked questions

Don’t see your question? We are happy to answer any questions or inquiries you may have.

Check the lubrication chart in your operation and maintenance manual. As a pattern, DEVELON says the boom, stick and bucket pins typically need daily greasing, with other points on the manufacturer’s schedule (source: DEVELON). Grease more often in wet, muddy or salty conditions, and after every wash.

Bobcat’s checklist for its compact track loaders lists the lift arms, lift links, cylinders, coupler, pivot pins and wedges every 8 to 10 hours (source: Bobcat). Skid steers carry the same kinds of lift-arm and coupler pivots, so expect a similar daily rhythm, but confirm it in your model’s manual.

Forklift grease points, such as steer axle kingpins, tilt cylinder pins and mast pivots, are listed in the lubrication chart for your model. Intervals vary by make and duty, so use the manual or ask your dealer rather than a general rule.

For its HOLLAND fifth wheels, SAF-HOLLAND calls for lubricating the locking mechanism every 3 months or 30,000 miles, whichever comes first, using water-resistant lithium-based grease on the contact surfaces after the old grease is removed (source: SAF-HOLLAND). NoLube models have different needs, and the truck’s chassis points follow the truck maker’s schedule.

No. Wheel bearings are wheel-end work tied to the hubs and brakes, and they should be serviced by a mechanic. We grease fifth wheels, hitches and the chassis and equipment fittings shown in the manual, and we’ll tell you if we spot a leaking hub or a fitting that won’t take grease.

Call